Project 13:
1. Project Type: Bridge-land
2. Project Name:
flyover construction first Line
3. Location:
District 1, District 3, Tan Binh District, Binh Thanh District, Phu Nhuan District
4. Length: about 9.5 km
5. project purpose:
to set up a north-south corridor in order to connect with the traffic load over-Resolution and Tan Son Nhat airport and the center of the heart.
6. investment capital expected: 15 trillion 460 billion Vietnamese dong (700 million US $ 3 million equivalent)
7. general information of the project
at the Prime Minister decision 568 / QD-Ttg, starting No. 1 elevated land road from Cong Hoa- Truong Chinh intersection and, Cong Hoa- Tran Quoc Hoan- Phan Thuc Duyen- Hoang Van Thu- Phan Dang Luu- Phan Xich Long- Phan Xich Long ( extension and prevention) - intersects with the Dien Bien Phu. Here divided road is bifurcated, one is down on the bottom of the Dien Bien Phu Street, one is along the Ngo Tat To Street - will be extended to the front of the Phu An Bridge. A length of about 9.5 km.
8. investment scheme: PPP, ODA
9. Contact:
Ho Chi Minh City Department of Transportation
Address: No. 63, Ly Tu Trong Street, Ben Nghe, 1, Ho Chi Minh City,
Telephone number: 84-8- 3829 0451
10. Notes: The
whole Yes master plan