① Based on the (raw materials) "raw materials standard", acceptance testing has been carried out.
② There are regularly carried out to rule the physical properties test of (raw materials) raw materials, the record is left.
③ (parts) and inspection items of the acceptance test components to reflect the important characteristics contents of the parts, it is appropriate the entire item.
④ (raw materials and components) implementation results of the acceptance tests (test date, examiner, confirmation's admission decision, etc.) have been described without omission in the "acceptance inspection report".
⑤ (raw materials and components) methods of treatment (including identification method) at the time of acceptance inspection failure has been determined, the record is left.